Be sure that when you do this the cap itself slopes away from the window downwards forming an awning over the window.
Siding drip edge installation.
Tom silva starts off his roofing lesson with the apprentices by stressing the.
How to cut nail and install durable fiber siding plus caulking and painting tips.
Add the drip edge while it may be a common practice to install drip edge tight to the fascia silva advocates for a.
Soffit and fascia if the soffit on your home wraps around a corner as with a hip roof you ll need to make some.
Make sure the outer edge extends over the gutter.
Begin at either end of the wall and set the level middle section of the z flashing onto the top edge of the siding panel with the wider flange upward and against the wall framing.
Fiber cement is tougher than other materials hold the starter 1 4 in.
This stock drip cap has a short backleg minimal drip leg and is often made from metal too thin to meet code standards.
You may need to nail through the starter strip into the drip edge.
How to install drip edge and step flashing 1.
Nail in the center of the nailing slots.
To seal the edge of a siding panel where it has been cut and to secure it to the wall you can use under sill trim.
If it doesn t pull the drip edge out slightly from under the shingles.
Soffit and fascia starting with the soffit nail lengths of j channel against the inner edge of the fascia board.
Secure cap to siding next secure the drip cap to your siding using galvanized nails.
Flush the end of the flashing length with the wall corner and secure the flashing to the framing with an 8d nail at each wall stud.
Secure the drip edge with roofing cement.
And not very durable.
Down preassemble the corners install fiber cement using a few special techniques layout the siding courses remove the plastic last flash the butt.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Just about the window apply flashing tape then slide the drip cap against the flashing tape and under the siding above it.
The back leg was only an inch and drip leg was just a square 90 degree 1 4 in.
Install the first length of z flashing.
Keep ends of adjoining starter strips at least 1 4 inch apart to allow for expansion.
Place a nail at one end then the other.
Start with the ice barrier in climate zones prone to ice damming code requires that a self adhering ice barrier.
Drop barely large enough to keep wind driven water from getting behind the siding.
How to install a drip edge.
The causeway connecting the house to the new garage in law suite needs a roof.